Home/Resource library/Doors and hardware contractor resources/Doors and hardware pre-bid site visit checklist

For project teams

Doors and hardware pre-bid site visit checklist.

Clearer work. Better questions. A more useful decision.

On this page

  1. Start with the decision
  2. Questions to take to the visit
  3. Put the checklist to work
  4. A scope gap worth discussing
  5. Using this in the US and Canada
  6. The next useful step

Good work starts
on the same page.

By Build Accord · Updated November 14, 2026

Start with the decision

Use a doors and hardware pre-bid visit to clarify conditions that the invitation cannot adequately describe. Prepare questions in advance, record what can and cannot be confirmed, and issue approved material clarifications to all bidders. A visit is not permission to investigate, disturb or alter the site.

This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the doors and hardware resource hub.

Questions to take to the visit

Working checklist — confirm against your project documents
Work areaQuestionRecord to reconcile
Doors and framesAre opening dimensions and handing confirmed?door schedule and opening identifiers
Hardware setsWho resolves hardware and access-control conflicts?hardware schedule and specified functions
Finishes and interfacesWhat surrounding work must finish before final adjustment?finish references and surrounding-work details

Download the doors and hardware site visit worksheet (CSV)

Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.

Put the checklist to work

  • Arrange authorized access with the project team and follow the site’s access instructions. Confirm which areas and documents may be photographed or shared.
  • Discuss frames, glazing, decoration, powered hardware and access-control integration. Ask which assumptions can be confirmed during the visit and which require further information.
  • Walk through the logistics affecting approved schedules, confirmed openings and resolution of electrical or access-control interfaces. Note occupied areas, delivery routes and work windows without prescribing an installation method.
  • Log each question with its location, respondent and required follow-up. Issue the approved response in the common clarification record.

A scope gap worth discussing

Illustrative example — not a Build Accord client project

A hardware quote includes mechanical sets but excludes electrified components. Resolve each opening’s requirements before treating the proposal as a complete door package.

Apply this to your decision: A dated visit note and clarification log that improves the bid package without giving one bidder a private version of the scope.

Using this in the US and Canada

For a project in the United States

Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.

For a project in Canada

Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.

For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.

The next useful step

Continue with how to compare doors and hardware contractor quotes. For the other side of the conversation, see the doors and hardware bid proposal guide.

Build Accord coordinates introductions between construction project teams and trade contractors. An inquiry starts a discussion of fit and availability; it does not guarantee a contractor, an invitation to bid or an award. These guides are not a listing of currently available crews or projects.

FROM NOTES TO NEXT STEPS

Let’s find common ground.

Tell us what work you need done or what work your crew takes on.

Discuss your project

Prepare an email to review and send. No automatic submission or fee commitment.

A little more groundwork.

Project planning

How to write a construction scope of work

A good brief leaves less room for guesswork.

Read the guide ↗

Project planning

How to compare construction quotes beyond price

The number is only part of the story.

Read the guide ↗

MAKE THE CONNECTION

Find construction contractorsFind project opportunitiesWho we are

FIELDNOTES

Browse resources by tradeAll articles & guidesWrite a clearer scopeBuild a contractor shortlist

BEFORE THE NEXT CONVERSATION

Introduce your capabilitiesCompare construction quotesFollow the RSS feed
BUILD ACCORD.
Good work. Common ground.
PrivacyTermsCreditsBack to top ↑