Start with the decision
A useful doors and hardware bid proposal connects a clearly identified scope to a stated price basis and delivery assumptions. Follow the invitation’s required form and instructions. Where a separate scope attachment is permitted, make the package boundaries easy to find rather than burying them in a general cover note.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the doors and hardware resource hub.
Tie each offer to a scope reference
| Package | Identify in the proposal | Clarify the responsibility |
|---|---|---|
| Doors and frames | door schedule and opening identifiers | door supply, frames and installation boundaries |
| Hardware sets | hardware schedule and specified functions | mechanical sets versus electrified components |
| Finishes and interfaces | finish references and surrounding-work details | decoration, glazing and adjustment responsibility |
Download the doors and hardware bid proposal worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- State your business, the project reference, the documents and addenda priced, the proposal date and the required response contact.
- List deliverables, quantities where appropriate, and assumptions. Address frames, glazing, decoration, powered hardware and access-control integration expressly and distinguish options from included work.
- Explain schedule assumptions involving approved schedules, confirmed openings and resolution of electrical or access-control interfaces. Do not promise an unconditional start date when important inputs are unconfirmed.
- State the currency and price basis, and address the commercial information requested by the invitation. Obtain appropriate review of proposed engagement terms rather than treating this checklist as contract wording.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A hardware quote includes mechanical sets but excludes electrified components. Resolve each opening’s requirements before treating the proposal as a complete door package.
Apply this to your decision: A readable, project-specific proposal with an identifiable scope, price basis and clarification record.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. For federal notices, use SAM.gov Contract Opportunities and check the individual notice’s stage and instructions. A prime-contract notice is not automatically a subcontract invitation.
For a project in Canada
Record the province or territory, municipality and actual service area. Use CanadaBuys tender opportunities as one public-procurement source, then read the issuer’s documents and submission route. Do not assume it lists every private construction package.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with how to follow up on a doors and hardware bid. For the other side of the conversation, see the doors and hardware project scope guide.
Build Accord coordinates introductions between construction project teams and trade contractors. An inquiry starts a discussion of fit and availability; it does not guarantee a contractor, an invitation to bid or an award. These guides are not a listing of currently available crews or projects.