Start with the decision
Compare doors and hardware proposals against the same scope and revision before comparing their totals. Pay particular attention to frames, glazing, decoration, powered hardware and access-control integration. The lowest number may describe a smaller package, and a more expensive offer may include work the other bidders have excluded.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the doors and hardware resource hub.
Level the scope before the price
| Package | Difference to check | Evidence to request |
|---|---|---|
| Doors and frames | door supply, frames and installation boundaries | A written confirmation covering door schedule and opening identifiers |
| Hardware sets | mechanical sets versus electrified components | A written confirmation covering hardware schedule and specified functions |
| Finishes and interfaces | decoration, glazing and adjustment responsibility | A written confirmation covering finish references and surrounding-work details |
Download the doors and hardware compare quotes worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Create a column for each proposal and a row for each required deliverable. Use not stated when the proposal is silent.
- Separate firm scope from allowances and options. Request the basis of any provisional quantity rather than inserting your own assumed price.
- Check schedule assumptions against approved schedules, confirmed openings and resolution of electrical or access-control interfaces. Compare like-for-like access and timing as well as materials and labour.
- Ask each bidder to incorporate agreed clarifications into a revised proposal. Keep the revision and date alongside the comparison.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A hardware quote includes mechanical sets but excludes electrified components. Resolve each opening’s requirements before treating the proposal as a complete door package.
Apply this to your decision: A comparison that explains scope and timing differences, plus a short clarification list. It is a decision aid, not an authorization to start work.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with doors and hardware contractor schedule and lead-time checklist. For the other side of the conversation, see the doors and hardware bid proposal guide.