Start with the decision
An effective doors and hardware invitation to bid tells a business what to price, which information controls and how to respond. Include a scope sheet, current references, known constraints and one clarification route. Make clear whether you need a budget estimate or a firm quotation.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the doors and hardware resource hub.
Assemble the pricing information
| Package | Source information | Requested pricing distinction |
|---|---|---|
| Doors and frames | door schedule and opening identifiers | door supply, frames and installation boundaries |
| Hardware sets | hardware schedule and specified functions | mechanical sets versus electrified components |
| Finishes and interfaces | finish references and surrounding-work details | decoration, glazing and adjustment responsibility |
Download the doors and hardware bid package worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Identify the issuer, project location, response deadline and time zone. State the permitted submission route and document-access arrangements.
- List drawing revisions and addenda. Include relevant information about approved schedules, confirmed openings and resolution of electrical or access-control interfaces, not simply an intended start date.
- Ask bidders to identify frames, glazing, decoration, powered hardware and access-control integration as included, excluded or separately offered. Request stated assumptions for unresolved items.
- Explain how questions and revised information will be distributed. Confirm receipt of important changes before relying on an earlier price.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A hardware quote includes mechanical sets but excludes electrified components. Resolve each opening’s requirements before treating the proposal as a complete door package.
Apply this to your decision: A consistent invitation with enough information for comparable responses and a clear record of the documents each bidder received.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with how to compare doors and hardware contractor quotes. For the other side of the conversation, see the doors and hardware bid proposal guide.