Start with the decision
Write the waterproofing scope around named deliverables, the drawings that describe them and the interfaces with other trades. Define the waterproofing assembly, location and interfaces in the project documents. Below-grade work, wet areas and deck applications should have clear package boundaries. Use the worksheet below to expose missing information before requesting a firm quotation.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the waterproofing resource hub.
Define each package boundary
| Deliverable | Input to include | Boundary to settle |
|---|---|---|
| Substrate preparation | substrate information and acceptance requirements | preparation versus separately scoped repairs |
| System application | system reference and termination details | application, junctions and testing responsibilities |
| Protection and handoff | protection details and following-trade sequence | protection, drainage and covering-work boundaries |
Download the waterproofing scope of work worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Attach the current drawing and specification references, and identify who may receive them. Separate issued information from items still awaiting approval.
- Assign substrate repairs, drainage, protection layers, sealants and following-trade damage explicitly. Use included, excluded, by others or unresolved, with a named owner for unresolved items.
- Document assumptions about accepted substrates, approved details and the release sequence for covering work. A target date is not a substitute for those inputs being available.
- Issue the same revision to all invited businesses. Record clarifications and circulate material changes before comparing proposals.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A waterproofing price excludes protection before backfill. Allocate that work and its timing before comparing bids or releasing the following trade.
Apply this to your decision: A scope sheet with deliverables, interfaces, exclusions and unresolved decisions that every invited business can price against.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with waterproofing invitation to bid checklist. For the other side of the conversation, see the waterproofing bid proposal guide.