For project teams
Define the waterproofing package and move from sourcing to a clear handover. Start with the decision you need to make today.
For contractors
Find suitable work, decide what to bid and present a proposal that makes your role clear. Each guide includes a working checklist.
What makes this package different
Look for experience with the specified system, substrate assessment and coordinated interfaces. Coordinate accepted substrates, approved details and the release sequence for covering work, and allocate substrate repairs, drainage, protection layers, sealants and following-trade damage explicitly.
| Package | Scope information | Interface |
|---|---|---|
| Substrate preparation | substrate information and acceptance requirements | preparation versus separately scoped repairs |
| System application | system reference and termination details | application, junctions and testing responsibilities |
| Protection and handoff | protection details and following-trade sequence | protection, drainage and covering-work boundaries |
US and Canadian projects
These guides cover planning conversations for both markets without inventing a separate page for every city. Use the actual project location to confirm service area, qualification checks and procurement instructions. Availability must be discussed individually.
Browse the complete trade library, or read who we are before making an inquiry.