Start with the decision
Describe tile and stone availability as a dated planning window with conditions, not a permanent promise. Check the proposed package against current commitments and approved selections, accepted substrates and resolution of layouts and junctions. A crew being free on a calendar does not establish that all project inputs will be ready.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the tile and stone resource hub.
Confirm capacity by package
| Package | Input needed to reserve work | Completion commitment |
|---|---|---|
| Substrate and assembly | substrate information and assembly details | agreed substrate and pre-installation records |
| Finish installation | tile or stone schedule and approved layouts | product details and agreed finish acceptance |
| Edges and protection | junction, trim and handoff details | agreed junction checks and area handoff |
Download the tile and stone crew availability worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Identify the responsible scheduling contact and the date capacity was reviewed. Separate estimating availability from delivery availability.
- Confirm the work your team will deliver directly and how substrate repairs, waterproofing, trims, movement details and protection after installation affects resource planning. Do not count unconfirmed third-party capacity as secured.
- Provide an indicative window with the assumptions required for it to hold. Explain when availability must be reconfirmed.
- Update the project contact if the window changes. Distinguish an inquiry, a provisional plan and an agreed engagement.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A washroom tile quotation excludes waterproofing that another proposal includes. Confirm the assembly boundary and responsible contractor before comparing prices.
Apply this to your decision: A dated capacity note showing the proposed window, prerequisite decisions and the next confirmation point.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. For federal notices, use SAM.gov Contract Opportunities and check the individual notice’s stage and instructions. A prime-contract notice is not automatically a subcontract invitation.
For a project in Canada
Record the province or territory, municipality and actual service area. Use CanadaBuys tender opportunities as one public-procurement source, then read the issuer’s documents and submission route. Do not assume it lists every private construction package.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with how to find tile and stone bid opportunities. For the other side of the conversation, see the tile and stone project scope guide.
Build Accord coordinates introductions between construction project teams and trade contractors. An inquiry starts a discussion of fit and availability; it does not guarantee a contractor, an invitation to bid or an award. These guides are not a listing of currently available crews or projects.