Start with the decision
Write the tile and stone scope around named deliverables, the drawings that describe them and the interfaces with other trades. Distinguish tile or stone finishes from substrate preparation and waterproofing. The room schedule, material selections and layout decisions should travel together. Use the worksheet below to expose missing information before requesting a firm quotation.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the tile and stone resource hub.
Define each package boundary
| Deliverable | Input to include | Boundary to settle |
|---|---|---|
| Substrate and assembly | substrate information and assembly details | preparation, repairs and waterproofing responsibility |
| Finish installation | tile or stone schedule and approved layouts | material supply, pattern and proposed substitutions |
| Edges and protection | junction, trim and handoff details | trims, joints, cleanup and later protection |
Download the tile and stone scope of work worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Attach the current drawing and specification references, and identify who may receive them. Separate issued information from items still awaiting approval.
- Assign substrate repairs, waterproofing, trims, movement details and protection after installation explicitly. Use included, excluded, by others or unresolved, with a named owner for unresolved items.
- Document assumptions about approved selections, accepted substrates and resolution of layouts and junctions. A target date is not a substitute for those inputs being available.
- Issue the same revision to all invited businesses. Record clarifications and circulate material changes before comparing proposals.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A washroom tile quotation excludes waterproofing that another proposal includes. Confirm the assembly boundary and responsible contractor before comparing prices.
Apply this to your decision: A scope sheet with deliverables, interfaces, exclusions and unresolved decisions that every invited business can price against.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.