Start with the decision
Look for site utility businesses whose experience matches the actual package, then confirm their service area and availability. Start by separating service runs, connections and structures, reinstatement. A general trade label is not enough to tell you whether a company is suited to all three.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the site utilities resource hub.
Build a shortlist around the work
| Package to discuss | Information to share | Question to ask |
|---|---|---|
| Service runs | system plans and defined start and end points | Which existing-service and ground records are available? |
| Connections and structures | connection details and structure schedule | Who authorizes and coordinates each connection? |
| Reinstatement | surface boundaries and handoff requirements | Who accepts the area before the next surface trade starts? |
Download the site utilities find contractors worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Prepare a short brief describing experience with the specified systems, connection coordination and constrained site access. Include location and intended timing without disclosing confidential client details.
- Seek businesses through relevant trade networks, project contacts and suitable directories. Confirm that a company serves the actual location; an online listing is not evidence of capacity.
- Ask who would handle excavation support, dewatering, authority work, testing and surface restoration. Keep responsibility gaps visible before inviting a detailed quotation.
- Record each business’s response, its source and the date. Mark unanswered questions as unconfirmed rather than treating them as a pass.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A site-service proposal stops at the property boundary while another includes coordination to the connection point. Confirm the actual scope and authorized responsibilities before comparing bids.
Apply this to your decision: A small, documented list of businesses worth inviting to the next conversation, with open questions assigned to a project-team member.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with site utilities subcontractor prequalification questions. For the other side of the conversation, see the site utilities bid proposal guide.