Start with the decision
Use prequalification to decide what evidence you need from a glazing business for this particular project. Prioritize experience with the specified system, site measurement and coordination with adjacent finishes. A completed form is only a record of responses; it does not independently verify capability or replace project-specific checks.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the glazing resource hub.
Connect the evidence to the package
| Work package | Relevant example to discuss | Clarification |
|---|---|---|
| Frames and openings | A comparable assignment involving opening schedule and system references | Who confirms final openings before fabrication? |
| Glass and panels | A comparable assignment involving glass schedule and specified performance references | Are selections and approvals complete? |
| Hardware and interfaces | A comparable assignment involving hardware schedule and adjacent-work details | Who coordinates powered or controlled openings? |
Download the glazing prequalification worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- State the package, location and intended schedule before asking the business for information. Request only evidence relevant to this engagement.
- Ask for its actual role in a comparable project. Separate work delivered directly from work performed by another business.
- Identify applicable qualification checks with the responsible project team and verify relevant credentials through the appropriate issuing source. Do not assume one check covers every jurisdiction.
- Review capacity against approved system information, confirmed openings and delivery or handling access. A record of past work does not establish present availability. Keep confidential qualification material in an agreed secure channel.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A storefront quote excludes perimeter interfaces with the wall contractor. Assign each interface before ordering rather than relying on two proposals that both exclude it.
Apply this to your decision: An evidence register showing what was requested, what was received, who checked it and what remains open before selection.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with glazing pre-bid site visit checklist. For the other side of the conversation, see the glazing bid proposal guide.