For project teams
Define the glazing package and move from sourcing to a clear handover. Start with the decision you need to make today.
For contractors
Find suitable work, decide what to bid and present a proposal that makes your role clear. Each guide includes a working checklist.
What makes this package different
Look for experience with the specified system, site measurement and coordination with adjacent finishes. Coordinate approved system information, confirmed openings and delivery or handling access, and allocate supporting openings, perimeter seals, access control, decoration and protection explicitly.
| Package | Scope information | Interface |
|---|---|---|
| Frames and openings | opening schedule and system references | frames, supports and opening-preparation responsibility |
| Glass and panels | glass schedule and specified performance references | specified glass versus proposed alternatives |
| Hardware and interfaces | hardware schedule and adjacent-work details | hardware, seals and electronic-control boundaries |
US and Canadian projects
These guides cover planning conversations for both markets without inventing a separate page for every city. Use the actual project location to confirm service area, qualification checks and procurement instructions. Availability must be discussed individually.
Browse the complete trade library, or read who we are before making an inquiry.