For project teams
Define the fire protection package and move from sourcing to a clear handover. Start with the decision you need to make today.
For contractors
Find suitable work, decide what to bid and present a proposal that makes your role clear. Each guide includes a working checklist.
What makes this package different
Look for the project’s required credentials, system experience and coordination with the responsible design team. Coordinate approved system information, service availability and the project’s acceptance process, and allocate alarm interfaces, water service, ceilings, penetrations and third-party acceptance work explicitly.
| Package | Scope information | Interface |
|---|---|---|
| System package | issued system documents and responsibility allocation | design, supply and installation boundaries |
| Building interfaces | ceiling, service and alarm coordination information | alarm connections, service work and finish restoration |
| Acceptance and handover | project-specific acceptance requirements | testing, witnessing and documentation responsibilities |
US and Canadian projects
These guides cover planning conversations for both markets without inventing a separate page for every city. Use the actual project location to confirm service area, qualification checks and procurement instructions. Availability must be discussed individually.
Browse the complete trade library, or read who we are before making an inquiry.