Start with the decision
A useful elevator modernization bid follow-up confirms receipt, addresses open scope questions and checks whether the project’s next decision has changed. Follow the issuer’s communication rules. Avoid treating repeated sales messages as a substitute for a complete and relevant proposal.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the elevator modernization resource hub.
Follow up with a useful clarification
| Package | Clarification to offer | Reference to include |
|---|---|---|
| Controls and retained equipment | controller and drive replacement versus retained cab and mechanical equipment | existing car inventory, controller scope and components proposed for reuse |
| Doors and landing fixtures | door operators, fixtures and finish repairs assigned to other trades | opening and fixture schedules by car and served floor |
| Outage and return to service | site coordination, inspection booking and responsibility for addressing outstanding items | car-by-car sequence, building access plan and acceptance milestones |
Download the elevator modernization bid follow up worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Check the invitation for the permitted contact and follow-up process. Confirm the bid reference and version rather than resending a generic sales pitch.
- Ask whether any information about retained components, connections by other trades, temporary access arrangements and inspection coordination needs clarification. Respond with a specific written answer and revised scope where necessary.
- Reconfirm assumptions about the equipment survey, building access, approved outage sequence and availability of the inspection parties when the decision is delayed. Do not imply that an old availability statement reserves a crew indefinitely.
- Record the response and agreed next action. If the buyer declines further contact or the procurement process restricts communication, respect that boundary.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
One bid includes new landing fixtures on every served floor while another reuses selected fixtures. Ask for a floor-by-floor list and check that the proposals allow for the same staggered outages before comparing totals.
Apply this to your decision: A short, relevant follow-up record covering receipt, outstanding questions and the next permitted contact point.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. For federal notices, use SAM.gov Contract Opportunities and check the individual notice’s stage and instructions. A prime-contract notice is not automatically a subcontract invitation.
For a project in Canada
Record the province or territory, municipality and actual service area. Use CanadaBuys tender opportunities as one public-procurement source, then read the issuer’s documents and submission route. Do not assume it lists every private construction package.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step