For project teams
Define the concrete package and move from sourcing to a clear handover. Start with the decision you need to make today.
For contractors
Find suitable work, decide what to bid and present a proposal that makes your role clear. Each guide includes a working checklist.
What makes this package different
Look for experience with the specified concrete elements, placement conditions and finish expectations. Coordinate approved drawings, access for placement, preceding preparation and release of following trades, and allocate excavation, subgrade preparation, reinforcing supply, testing and protection after placement explicitly.
| Package | Scope information | Interface |
|---|---|---|
| Foundations | foundation drawings and package limits | excavation, forming, reinforcing and placement boundaries |
| Slabs | area boundaries, specified finish and interfaces | base preparation, joints and protection |
| Exterior flatwork | locations, interfaces and finish schedule | removals, base work and adjacent restoration |
US and Canadian projects
These guides cover planning conversations for both markets without inventing a separate page for every city. Use the actual project location to confirm service area, qualification checks and procurement instructions. Availability must be discussed individually.
Browse the complete trade library, or read who we are before making an inquiry.