Start with the decision
Use a architectural signage pre-bid visit to clarify conditions that the invitation cannot adequately describe. Prepare questions in advance, record what can and cannot be confirmed, and issue approved material clarifications to all bidders. A visit is not permission to investigate, disturb or alter the site.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the architectural signage resource hub.
Questions to take to the visit
| Work area | Question | Record to reconcile |
|---|---|---|
| Sign schedule and artwork | Who owns the room numbers and when can the installer freeze the schedule? | indexed sign list with messages, locations and approval status |
| Fabrication and mounting | Which conditions need a site measurement before shop drawings can be approved? | material and finish selections with mounting locations and substrate details |
| Illuminated signs and turnover | Who supplies and checks power at the agreed handoff point? | illumination schedule, connection responsibility and project approval references |
Download the architectural signage site visit worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Arrange authorized access with the project team and follow the site’s access instructions. Confirm which areas and documents may be photographed or shared.
- Discuss sign permits, backing or foundations, power supply, access equipment and restoration after removal. Ask which assumptions can be confirmed during the visit and which require further information.
- Walk through the logistics affecting approved message and artwork files, sign location verification, and readiness of mounting surfaces and electrical connections. Note occupied areas, delivery routes and work windows without prescribing an installation method.
- Log each question with its location, respondent and required follow-up. Issue the approved response in the common clarification record.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A bid prices every directory panel in the room schedule but excludes changing the final tenant names after artwork approval. Identify the last editable milestone and distinguish spare inserts from replacements before award.
Apply this to your decision: A dated visit note and clarification log that improves the bid package without giving one bidder a private version of the scope.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with how to compare architectural signage contractor quotes. For the other side of the conversation, see the architectural signage bid proposal guide.