For project teams
Define the architectural signage package and move from sourcing to a clear handover. Start with the decision you need to make today.
For contractors
Find suitable work, decide what to bid and present a proposal that makes your role clear. Each guide includes a working checklist.
What makes this package different
Look for experience with exterior signs or interior wayfinding, fabrication for the specified substrates and coordination of approvals and mounting. Coordinate approved message and artwork files, sign location verification, and readiness of mounting surfaces and electrical connections, and allocate sign permits, backing or foundations, power supply, access equipment and restoration after removal explicitly.
| Package | Scope information | Interface |
|---|---|---|
| Sign schedule and artwork | indexed sign list with messages, locations and approval status | artwork development, proof revisions and owner-supplied files |
| Fabrication and mounting | material and finish selections with mounting locations and substrate details | backing, anchors, foundations, lifts and repairs at old sign locations |
| Illuminated signs and turnover | illumination schedule, connection responsibility and project approval references | sign wiring versus incoming power, controls and changes made after inspection |
Industry reference
Use this overview to separate sign approval from fabrication and installation. Check the local authority’s actual application and approval steps for the site. International Sign Association permitting resources.
US and Canadian projects
These guides cover planning conversations for both markets without inventing a separate page for every city. Use the actual project location to confirm service area, qualification checks and procurement instructions. Availability must be discussed individually.
Browse the complete trade library, or read who we are before making an inquiry.