Start with the decision
Build the structural steel schedule around confirmed dependencies rather than a promised duration in isolation. The important inputs include approved design information, fabrication release, delivery sequence and supporting-work readiness. Ask the contractor to state what must be ready before it can begin and what the following trade will receive.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the structural steel resource hub.
Plan the handoffs
| Package | Information needed before release | Completion handoff |
|---|---|---|
| Fabrication | member schedule and issued design information | approved fabrication information and required records |
| Delivery and erection | site sequence and access information | agreed erection and inspection documentation |
| Interfaces and finishes | coating schedule and adjoining-work details | interface acceptance and specified finish records |
Download the structural steel schedule worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Separate approvals, procurement, mobilization, installation and completion checks. Assign an owner to each release decision.
- Ask for the contractor’s stated availability and the date it was confirmed. Do not present an indicative window as a reserved crew.
- Resolve interfaces involving connection design responsibilities, coatings, temporary works, lifting and fire protection. Put decisions and deliveries that affect the sequence into the same schedule discussion.
- Agree how changes will be raised. Record the affected activity, revised assumption and who confirms the next workable date.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
One steel proposal includes fabrication only while another includes erection. Align delivery, lifting and installation responsibilities before leveling the bids.
Apply this to your decision: A dependency-based schedule discussion with named owners and confirmation dates, without invented standard durations or guaranteed delivery windows.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with structural steel contractor handover checklist. For the other side of the conversation, see the structural steel bid proposal guide.