Skip to content
BUILD ACCORD.
Resources
Trade resource libraryFieldnotes / BlogWho we areFor project teamsFor contractors
Start a conversation
Home/Resource library/Site utilities contractor resources/Site utilities estimating and takeoff checklist

For contractors

Site utilities estimating and takeoff checklist.

Know the package. Make the next conversation count.

On this page

  1. Start with the decision
  2. Record quantities with their basis
  3. Put the checklist to work
  4. A scope gap worth discussing
  5. Using this in the US and Canada
  6. The next useful step

Good work starts
on the same page.

By Build Accord · Updated November 14, 2026

Start with the decision

Start a site utility takeoff by recording the document revision and measurement basis. Separate quantity measurement from pricing and clearly identify items that cannot yet be measured reliably. The worksheet below organizes the estimate; it does not supply design quantities, production rates or market prices.

This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the site utilities resource hub.

Record quantities with their basis

Working checklist — confirm against your project documents
PackageMeasurement basisInclusion check
Service runslengths by system and provided drawing referencepipe or conduit work versus excavation and support
Connections and structuresstructures and connections by identifierowner or authority work versus contractor work
Reinstatementrestoration areas by surface typebackfill, paving and landscape restoration

Download the site utilities takeoff checklist worksheet (CSV)

Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.

Put the checklist to work

  • List the drawings, schedules and addenda used. Keep units consistent and show where a dimension or quantity came from.
  • Measure the defined packages separately. Flag excavation support, dewatering, authority work, testing and surface restoration so quantities are not silently omitted or counted in multiple packages.
  • Record allowances, waste assumptions and unresolved dimensions explicitly. Ask for missing information instead of labeling an estimate as a confirmed quantity.
  • Check the takeoff against scope changes and approved information, service-owner coordination and readiness of preceding ground work. Have another qualified estimator review important assumptions when the package warrants it.

A scope gap worth discussing

Illustrative example — not a Build Accord client project

A site-service proposal stops at the property boundary while another includes coordination to the connection point. Confirm the actual scope and authorized responsibilities before comparing bids.

Apply this to your decision: A traceable takeoff record with quantities, units, source references and open questions, ready for project-specific pricing.

Using this in the US and Canada

For a project in the United States

Record the state, local jurisdiction and actual service area. For federal notices, use SAM.gov Contract Opportunities and check the individual notice’s stage and instructions. A prime-contract notice is not automatically a subcontract invitation.

For a project in Canada

Record the province or territory, municipality and actual service area. Use CanadaBuys tender opportunities as one public-procurement source, then read the issuer’s documents and submission route. Do not assume it lists every private construction package.

For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.

The next useful step

Continue with site utilities bid inclusions and exclusions checklist. For the other side of the conversation, see the site utilities project scope guide.

Build Accord coordinates introductions between construction project teams and trade contractors. An inquiry starts a discussion of fit and availability; it does not guarantee a contractor, an invitation to bid or an award. These guides are not a listing of currently available crews or projects.

FROM NOTES TO NEXT STEPS

Let’s find common ground.

Tell us what work you need done or what work your crew takes on.

Introduce your business

Prepare an email to review and send. No automatic submission or fee commitment.

A little more groundwork.

Project planning

How to write a construction scope of work

A good brief leaves less room for guesswork.

Read the guide ↗

Project planning

How to compare construction quotes beyond price

The number is only part of the story.

Read the guide ↗

MAKE THE CONNECTION

Find construction contractorsFind project opportunitiesWho we are

FIELDNOTES

Browse resources by tradeAll articles & guidesWrite a clearer scopeBuild a contractor shortlist

BEFORE THE NEXT CONVERSATION

Introduce your capabilitiesCompare construction quotesFollow the RSS feed
BUILD ACCORD.
Good work. Common ground.
PrivacyTermsCreditsBack to top ↑