Skip to content
BUILD ACCORD.
Resources
Trade resource libraryFieldnotes / BlogWho we areFor project teamsFor contractors
Start a conversation
Home/Resource library/Site utilities contractor resources/Site utilities contractor availability and capacity checklist

For contractors

Site utilities contractor availability and capacity checklist.

Know the package. Make the next conversation count.

On this page

  1. Start with the decision
  2. Confirm capacity by package
  3. Put the checklist to work
  4. A scope gap worth discussing
  5. Using this in the US and Canada
  6. The next useful step

Good work starts
on the same page.

By Build Accord · Updated November 14, 2026

Start with the decision

Describe site utility availability as a dated planning window with conditions, not a permanent promise. Check the proposed package against current commitments and approved information, service-owner coordination and readiness of preceding ground work. A crew being free on a calendar does not establish that all project inputs will be ready.

This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the site utilities resource hub.

Confirm capacity by package

Working checklist — confirm against your project documents
PackageInput needed to reserve workCompletion commitment
Service runssystem plans and defined start and end pointsrequired as-installed and testing documentation
Connections and structuresconnection details and structure scheduleagreed connection and acceptance records
Reinstatementsurface boundaries and handoff requirementsspecified reinstatement and handoff records

Download the site utilities crew availability worksheet (CSV)

Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.

Put the checklist to work

  • Identify the responsible scheduling contact and the date capacity was reviewed. Separate estimating availability from delivery availability.
  • Confirm the work your team will deliver directly and how excavation support, dewatering, authority work, testing and surface restoration affects resource planning. Do not count unconfirmed third-party capacity as secured.
  • Provide an indicative window with the assumptions required for it to hold. Explain when availability must be reconfirmed.
  • Update the project contact if the window changes. Distinguish an inquiry, a provisional plan and an agreed engagement.

A scope gap worth discussing

Illustrative example — not a Build Accord client project

A site-service proposal stops at the property boundary while another includes coordination to the connection point. Confirm the actual scope and authorized responsibilities before comparing bids.

Apply this to your decision: A dated capacity note showing the proposed window, prerequisite decisions and the next confirmation point.

Using this in the US and Canada

For a project in the United States

Record the state, local jurisdiction and actual service area. For federal notices, use SAM.gov Contract Opportunities and check the individual notice’s stage and instructions. A prime-contract notice is not automatically a subcontract invitation.

For a project in Canada

Record the province or territory, municipality and actual service area. Use CanadaBuys tender opportunities as one public-procurement source, then read the issuer’s documents and submission route. Do not assume it lists every private construction package.

For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.

The next useful step

Continue with how to find site utility bid opportunities. For the other side of the conversation, see the site utilities project scope guide.

Build Accord coordinates introductions between construction project teams and trade contractors. An inquiry starts a discussion of fit and availability; it does not guarantee a contractor, an invitation to bid or an award. These guides are not a listing of currently available crews or projects.

FROM NOTES TO NEXT STEPS

Let’s find common ground.

Tell us what work you need done or what work your crew takes on.

Introduce your business

Prepare an email to review and send. No automatic submission or fee commitment.

A little more groundwork.

Business development

How to write a contractor capability statement

Show what your business is built to do.

Read the guide ↗

Project planning

How to write a construction scope of work

A good brief leaves less room for guesswork.

Read the guide ↗

MAKE THE CONNECTION

Find construction contractorsFind project opportunitiesWho we are

FIELDNOTES

Browse resources by tradeAll articles & guidesWrite a clearer scopeBuild a contractor shortlist

BEFORE THE NEXT CONVERSATION

Introduce your capabilitiesCompare construction quotesFollow the RSS feed
BUILD ACCORD.
Good work. Common ground.
PrivacyTermsCreditsBack to top ↑