For project teams
Define the roofing package and move from sourcing to a clear handover. Start with the decision you need to make today.
For contractors
Find suitable work, decide what to bid and present a proposal that makes your role clear. Each guide includes a working checklist.
What makes this package different
Look for experience with the proposed roofing system and occupied-building coordination. Coordinate approved system details, delivery and lifting arrangements, and a suitable installation window, and allocate deck repairs, roof drains, rooftop equipment, penetrations and temporary weather protection explicitly.
| Package | Scope information | Interface |
|---|---|---|
| Roof field | roof areas, system reference and removal limits | tear-off, insulation and specified assembly |
| Edges and penetrations | edge details and penetration inventory | flashings, equipment interfaces and responsibility gaps |
| Access and protection | site access and occupied-area constraints | lifting, storage, debris removal and temporary protection |
US and Canadian projects
These guides cover planning conversations for both markets without inventing a separate page for every city. Use the actual project location to confirm service area, qualification checks and procurement instructions. Availability must be discussed individually.
Browse the complete trade library, or read who we are before making an inquiry.