Skip to content
BUILD ACCORD.
Resources
Trade resource libraryFieldnotes / BlogWho we areFor project teamsFor contractors
Start a conversation
Home/Resource library/Paving contractor resources/Paving bid inclusions and exclusions checklist

For contractors

Paving bid inclusions and exclusions checklist.

Know the package. Make the next conversation count.

On this page

  1. Start with the decision
  2. Create a responsibility matrix
  3. Put the checklist to work
  4. A scope gap worth discussing
  5. Using this in the US and Canada
  6. The next useful step

Good work starts
on the same page.

By Build Accord · Updated November 14, 2026

Start with the decision

Use paving exclusions to make responsibility clear, not to hide essential work in fine print. The interfaces most worth discussing include removals, base repairs, drainage adjustments, curbs and line marking. If the invitation requires an item you do not include, identify the gap through its permitted clarification process before assuming your bid is comparable.

This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the paving resource hub.

Create a responsibility matrix

Working checklist — confirm against your project documents
PackageBoundary to classifyReference to check
Removal and preparationmilling, removal and base-repair allowancesexisting pavement information and work limits
Pavement placementspecified build-up versus proposed alternativespavement specification and area plan
Edges and markingscurbs, adjustments and final markingedge, drainage and marking plans

Download the paving bid exclusions worksheet (CSV)

Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.

Put the checklist to work

  • Give each interface a status: included, excluded, by others, optional or unresolved. Name the responsible party only when that allocation has been confirmed.
  • Separate a factual scope exclusion from an assumption about site conditions. Explain what information would resolve the assumption.
  • Check exclusions against accepted base conditions, access staging and release of affected traffic areas. An omitted prerequisite can affect timing as well as price.
  • When the scope changes, revise both the inclusions and exclusions. Keep the final offer aligned with the clarification record.

A scope gap worth discussing

Illustrative example — not a Build Accord client project

One parking-area proposal includes local base repairs and another assumes a ready base. Agree the repair scope and quantity basis before leveling the totals.

Apply this to your decision: A responsibility matrix that makes gaps discussable before selection, with no assumption that a blanket exclusion overrides project requirements.

Using this in the US and Canada

For a project in the United States

Record the state, local jurisdiction and actual service area. For federal notices, use SAM.gov Contract Opportunities and check the individual notice’s stage and instructions. A prime-contract notice is not automatically a subcontract invitation.

For a project in Canada

Record the province or territory, municipality and actual service area. Use CanadaBuys tender opportunities as one public-procurement source, then read the issuer’s documents and submission route. Do not assume it lists every private construction package.

For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.

The next useful step

Continue with paving subcontractor bid proposal checklist. For the other side of the conversation, see the paving project scope guide.

Build Accord coordinates introductions between construction project teams and trade contractors. An inquiry starts a discussion of fit and availability; it does not guarantee a contractor, an invitation to bid or an award. These guides are not a listing of currently available crews or projects.

FROM NOTES TO NEXT STEPS

Let’s find common ground.

Tell us what work you need done or what work your crew takes on.

Introduce your business

Prepare an email to review and send. No automatic submission or fee commitment.

A little more groundwork.

Project planning

How to write a construction scope of work

A good brief leaves less room for guesswork.

Read the guide ↗

Project planning

How to compare construction quotes beyond price

The number is only part of the story.

Read the guide ↗

MAKE THE CONNECTION

Find construction contractorsFind project opportunitiesWho we are

FIELDNOTES

Browse resources by tradeAll articles & guidesWrite a clearer scopeBuild a contractor shortlist

BEFORE THE NEXT CONVERSATION

Introduce your capabilitiesCompare construction quotesFollow the RSS feed
BUILD ACCORD.
Good work. Common ground.
PrivacyTermsCreditsBack to top ↑