Start with the decision
Build the millwork schedule around confirmed dependencies rather than a promised duration in isolation. The important inputs include approved shop information, finish selections and confirmed site dimensions. Ask the contractor to state what must be ready before it can begin and what the following trade will receive.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the millwork resource hub.
Plan the handoffs
| Package | Information needed before release | Completion handoff |
|---|---|---|
| Cabinetry and assemblies | item schedule, drawings and finish references | approved shop information and assembly records |
| Countertops and finishes | material selections and junction details | finish information and agreed acceptance record |
| Installation interfaces | backing, services and access information | agreed installation checks and operating information |
Download the millwork schedule worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Separate approvals, procurement, mobilization, installation and completion checks. Assign an owner to each release decision.
- Ask for the contractor’s stated availability and the date it was confirmed. Do not present an indicative window as a reserved crew.
- Resolve interfaces involving countertops, appliances, plumbing connections, electrical work and wall backing. Put decisions and deliveries that affect the sequence into the same schedule discussion.
- Agree how changes will be raised. Record the affected activity, revised assumption and who confirms the next workable date.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A reception-desk proposal excludes the countertop carried by another bidder. Align the assembly and installation boundaries before comparing the total.
Apply this to your decision: A dependency-based schedule discussion with named owners and confirmation dates, without invented standard durations or guaranteed delivery windows.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with millwork contractor handover checklist. For the other side of the conversation, see the millwork bid proposal guide.
Build Accord coordinates introductions between construction project teams and trade contractors. An inquiry starts a discussion of fit and availability; it does not guarantee a contractor, an invitation to bid or an award. These guides are not a listing of currently available crews or projects.