Start with the decision
Write the masonry scope around named deliverables, the drawings that describe them and the interfaces with other trades. Identify whether the masonry package is new walling, veneer or repairs. Quantities need to be tied to wall types, openings and approved details rather than an undifferentiated wall area. Use the worksheet below to expose missing information before requesting a firm quotation.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the masonry resource hub.
Define each package boundary
| Deliverable | Input to include | Boundary to settle |
|---|---|---|
| Wall construction | wall types, unit selections and referenced details | units, reinforcing and supporting interfaces |
| Openings and interfaces | opening schedule and junction details | lintels, flashings and adjacent-trade boundaries |
| Repairs and finish | repair locations and intended appearance | replacement, cleaning and protection limits |
Download the masonry scope of work worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Attach the current drawing and specification references, and identify who may receive them. Separate issued information from items still awaiting approval.
- Assign supports, flashings, insulation, access equipment, cleaning and protection explicitly. Use included, excluded, by others or unresolved, with a named owner for unresolved items.
- Document assumptions about approved samples, material availability and readiness of supporting and adjoining work. A target date is not a substitute for those inputs being available.
- Issue the same revision to all invited businesses. Record clarifications and circulate material changes before comparing proposals.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
A veneer proposal excludes flashings that another bidder includes. Allocate the interface explicitly so an apparent saving does not leave an incomplete wall package.
Apply this to your decision: A scope sheet with deliverables, interfaces, exclusions and unresolved decisions that every invited business can price against.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with masonry invitation to bid checklist. For the other side of the conversation, see the masonry bid proposal guide.
Build Accord coordinates introductions between construction project teams and trade contractors. An inquiry starts a discussion of fit and availability; it does not guarantee a contractor, an invitation to bid or an award. These guides are not a listing of currently available crews or projects.