Masonry scope of work checklist.

Clearer work. Better questions. A more useful decision.

On this page

  1. Start with the decision
  2. Define each package boundary
  3. Put the checklist to work
  4. A scope gap worth discussing
  5. Using this in the US and Canada
  6. The next useful step

Good work starts
on the same page.

By Build Accord · Updated November 14, 2026

Start with the decision

Write the masonry scope around named deliverables, the drawings that describe them and the interfaces with other trades. Identify whether the masonry package is new walling, veneer or repairs. Quantities need to be tied to wall types, openings and approved details rather than an undifferentiated wall area. Use the worksheet below to expose missing information before requesting a firm quotation.

This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the masonry resource hub.

Define each package boundary

Working checklist — confirm against your project documents
DeliverableInput to includeBoundary to settle
Wall constructionwall types, unit selections and referenced detailsunits, reinforcing and supporting interfaces
Openings and interfacesopening schedule and junction detailslintels, flashings and adjacent-trade boundaries
Repairs and finishrepair locations and intended appearancereplacement, cleaning and protection limits

Download the masonry scope of work worksheet (CSV)

Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.

Put the checklist to work

  • Attach the current drawing and specification references, and identify who may receive them. Separate issued information from items still awaiting approval.
  • Assign supports, flashings, insulation, access equipment, cleaning and protection explicitly. Use included, excluded, by others or unresolved, with a named owner for unresolved items.
  • Document assumptions about approved samples, material availability and readiness of supporting and adjoining work. A target date is not a substitute for those inputs being available.
  • Issue the same revision to all invited businesses. Record clarifications and circulate material changes before comparing proposals.

A scope gap worth discussing

Illustrative example — not a Build Accord client project

A veneer proposal excludes flashings that another bidder includes. Allocate the interface explicitly so an apparent saving does not leave an incomplete wall package.

Apply this to your decision: A scope sheet with deliverables, interfaces, exclusions and unresolved decisions that every invited business can price against.

Using this in the US and Canada

For a project in the United States

Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.

For a project in Canada

Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.

For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.

The next useful step

Continue with masonry invitation to bid checklist. For the other side of the conversation, see the masonry bid proposal guide.

Build Accord coordinates introductions between construction project teams and trade contractors. An inquiry starts a discussion of fit and availability; it does not guarantee a contractor, an invitation to bid or an award. These guides are not a listing of currently available crews or projects.

FROM NOTES TO NEXT STEPS

Let’s find common ground.

Tell us what work you need done or what work your crew takes on.

Discuss your project

Prepare an email to review and send. No automatic submission or fee commitment.

A little more groundwork.

Project planning

How to write a construction scope of work

A good brief leaves less room for guesswork.

Read the guide ↗

Project planning

How to compare construction quotes beyond price

The number is only part of the story.

Read the guide ↗

MAKE THE CONNECTION

Find construction contractorsFind project opportunitiesWho we are

FIELDNOTES

Browse resources by tradeAll articles & guidesWrite a clearer scopeBuild a contractor shortlist

BEFORE THE NEXT CONVERSATION

Introduce your capabilitiesCompare construction quotesFollow the RSS feed
BUILD ACCORD.
Good work. Common ground.
PrivacyTermsCreditsBack to top ↑