For project teams
Define the fencing package and move from sourcing to a clear handover. Start with the decision you need to make today.
For contractors
Find suitable work, decide what to bid and present a proposal that makes your role clear. Each guide includes a working checklist.
What makes this package different
Look for experience with the fence system, gate arrangements and site-access constraints. Coordinate confirmed boundary information, approved selections and coordinated ground or access work, and allocate survey, removals, ground obstructions, electrical gate work and access control explicitly.
| Package | Scope information | Interface |
|---|---|---|
| Fence runs | line plan, system reference and boundary information | materials, posts, removal and ground-condition assumptions |
| Gates | opening schedule and intended gate operation | manual operation versus powered and controlled access |
| Site interfaces | adjacent surfaces and access requirements | making good, drainage and temporary access |
US and Canadian projects
These guides cover planning conversations for both markets without inventing a separate page for every city. Use the actual project location to confirm service area, qualification checks and procurement instructions. Availability must be discussed individually.
Browse the complete trade library, or read who we are before making an inquiry.