Start with the decision
Compare electrical proposals against the same scope and revision before comparing their totals. Pay particular attention to utility-side work, temporary power, controls and repair of opened finishes. The lowest number may describe a smaller package, and a more expensive offer may include work the other bidders have excluded.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the electrical resource hub.
Level the scope before the price
| Package | Difference to check | Evidence to request |
|---|---|---|
| Power distribution | equipment supply versus installation and utility coordination | A written confirmation covering equipment schedule, connection points and approved drawings |
| Lighting | fixtures, supports, controls and making good | A written confirmation covering fixture schedule, switching intent and room boundaries |
| Tenant connections | final connections, disconnects and equipment supplied by others | A written confirmation covering equipment requiring connection and trade responsibility |
Download the electrical compare quotes worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Create a column for each proposal and a row for each required deliverable. Use not stated when the proposal is silent.
- Separate firm scope from allowances and options. Request the basis of any provisional quantity rather than inserting your own assumed price.
- Check schedule assumptions against equipment release dates, authorized shutdown windows and readiness of rooms receiving equipment. Compare like-for-like access and timing as well as materials and labour.
- Ask each bidder to incorporate agreed clarifications into a revised proposal. Keep the revision and date alongside the comparison.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
An office lighting package grows to include changes at the distribution panel. Confirm whether the same invitation still describes the work, and issue the revised package to every bidder.
Apply this to your decision: A comparison that explains scope and timing differences, plus a short clarification list. It is a decision aid, not an authorization to start work.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with electrical contractor schedule and lead-time checklist. For the other side of the conversation, see the electrical bid proposal guide.