Start with the decision
Before estimating a electrical project, decide whether the scope, location, information and timing fit your business. Pay attention to equipment release dates, authorized shutdown windows and readiness of rooms receiving equipment. A busy bid calendar is not useful if the packages cannot be delivered with your actual capabilities and capacity.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the electrical resource hub.
Identify the unknowns before estimating
| Package | Information needed to decide | Potential scope gap |
|---|---|---|
| Power distribution | equipment schedule, connection points and approved drawings | equipment supply versus installation and utility coordination |
| Lighting | fixture schedule, switching intent and room boundaries | fixtures, supports, controls and making good |
| Tenant connections | equipment requiring connection and trade responsibility | final connections, disconnects and equipment supplied by others |
Download the electrical bid no bid worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Check the issuer, deadline, current documents and required submission conditions. Confirm that the notice is seeking the type of business you operate.
- Compare the work with experience with the proposed system, occupied-building constraints and the division between electrical and low-voltage work. Identify any portion needing another business or additional resources.
- Review utility-side work, temporary power, controls and repair of opened finishes and decide which unresolved questions prevent a reliable estimate. Seek clarification through the permitted channel.
- Choose proceed, clarify or decline, and record the reason. Do not invent a precise probability of winning when you have no supporting evidence.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
An office lighting package grows to include changes at the distribution panel. Confirm whether the same invitation still describes the work, and issue the revised package to every bidder.
Apply this to your decision: A short decision record that directs estimating effort toward viable packages and identifies what must be clarified first.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. For federal notices, use SAM.gov Contract Opportunities and check the individual notice’s stage and instructions. A prime-contract notice is not automatically a subcontract invitation.
For a project in Canada
Record the province or territory, municipality and actual service area. Use CanadaBuys tender opportunities as one public-procurement source, then read the issuer’s documents and submission route. Do not assume it lists every private construction package.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with electrical estimating and takeoff checklist. For the other side of the conversation, see the electrical project scope guide.