Start with the decision
Write the demolition scope around named deliverables, the drawings that describe them and the interfaces with other trades. A demolition brief must make retained and removed work clear. It should identify the available surveys and responsibility for specialist assessments without prescribing a demolition method. Use the worksheet below to expose missing information before requesting a firm quotation.
This guide is for business-to-business project planning in the United States and Canada. For the wider trade context, visit the demolition resource hub.
Define each package boundary
| Deliverable | Input to include | Boundary to settle |
|---|---|---|
| Selective removal | marked removal drawings and retained elements | removal limits and protection of retained work |
| Service interfaces | identified services and responsibility matrix | isolation, disconnection and temporary service packages |
| Waste and salvage | material information and agreed ownership | salvage, sorting, transport and specialist handling |
Download the demolition scope of work worksheet (CSV)
Fill in the response, owner or source, and date checked. Keep unresolved items visible. The file contains planning prompts only; it does not calculate quantities or make an approval decision.
Put the checklist to work
- Attach the current drawing and specification references, and identify who may receive them. Separate issued information from items still awaiting approval.
- Assign hazardous-material work, structural assessment, service isolation, salvage and making good explicitly. Use included, excluded, by others or unresolved, with a named owner for unresolved items.
- Document assumptions about authorized surveys, service coordination, access restrictions and the approved work plan. A target date is not a substitute for those inputs being available.
- Issue the same revision to all invited businesses. Record clarifications and circulate material changes before comparing proposals.
A scope gap worth discussing
Illustrative example — not a Build Accord client project
An interior removal quote assumes finishes contain no materials requiring specialist handling. Keep that assumption separate from confirmed survey information and resolve it through the responsible project team.
Apply this to your decision: A scope sheet with deliverables, interfaces, exclusions and unresolved decisions that every invited business can price against.
Using this in the US and Canada
For a project in the United States
Record the state, local jurisdiction and actual service area. Confirm the project location and the scope of the business’s authority with the responsible project team. The U.S. Small Business Administration provides a starting point for business licensing resources.
For a project in Canada
Record the province or territory, municipality and actual service area. Use Canada’s permits and licences resources to locate relevant checks, including the linked BizPaL service. Confirm requirements for the actual activity and location.
For either market, state the currency, units and deadline time zone. This worksheet is general planning guidance, not a determination of licensing, procurement eligibility or technical compliance.
The next useful step
Continue with demolition invitation to bid checklist. For the other side of the conversation, see the demolition bid proposal guide.